Meeting Start
The kick-off meeting was held January 27.
3:30 to redefine everything and sign the first check on the work-injury insurance.
In short, we did change some partitions, defined the location of the elements of cooking, interuptor taken, no water ....
Finally, we chose the colors of sanitary, tiles, plaster exterior.
The interview ended with a small bill in addition to adding some extras:
Gateways input a little more upscale than the base model
socket A tile kitchen extraction hood (thin, I have not thought about trading for starting ...)
A garage door size suitable for the specification of Buildings Architect of France (That is, we required a minimum square section, Babeau offers me a size 2.25 x2, 40, 15cm good must come out The measuring tape) to memo, the standard size is 2.00 x2, 40
A Swedish shower (built into the slab)
The tiling diagonal
That, at least, satisfied with this service, we hate to see get the digger!
soon afterwards (I'm gonna insert a photo of our panel allowed!)